Friday, 27 April 2012

WEEK 14: ENGINEER DAY'S ( FYP PRESENTATION)


Objectives: 
To test a level of understanding for my final year project.
To present about programmable control home safety via gsm modem; the performance or what have been achieved.
To improve myself, in term of knowledge, presentation and communication.


Content / Procedure: 
Refer to FYP scheme, presentation degree semester 2 to prepare a material.
Discuss with supervisor, about how to tackle the question.
Done a more research about basic knowledge of GSM modem and program microcontroller.
Prepare a video as an supported material 
Ensure the prototype in high good condition.


Result and Analysis:
I'm done a slideshow, poster and a few testing towards hydro prototype to ensure it work properly during presentation.
The presentation will be conducted by 2 referee.
My presentation considerably good and smooth.
The poster and pictures for presentation shown below:






Conclusions
Personally, i'm glad that i be able to complete my FYP project until achieved the goal because of some difficulty to find a reference and so on.Then i got top 20 in BMI.Alhamdulillah.
This project   programmable control home safety via gsm modem  takes more effort to make it with excellent.
This project can be develop into another level if the new candidate; who have an interest towards control the appliances in the house to spend an effort, time and money to make it more useful.

Friday, 20 April 2012

WEEK 13


Title: 
Preparation for the presentation day.
Presentation Day


Objective:
To prepare the presentation Poster.
To present the project of "Progammable control home safety via GSM modem" that will be contributes 10% of the coursework.


Contents / Procedures: The presentation day is on Week 14, Thursday, April 24, 2012. The presentation day is held at three places which is Dewan Gemilang, TTL foyer and academic building at level 2 and level 3. The project of mine will be access by Madam Nazariah and Dr.Ahmad Basri. Before the presentation, the poster show has been shown to the supervisor, Tuan haji Dr Zainudin bin Kornain.


Results: The event is going smoothly and during the presentation time, assessors ask some question regarding on the project.


This my poster.

Conclusion: The presentation is one of the way to test the knowledge of student on their project either they understand what they are going to do or not.

Friday, 13 April 2012

WEEK 12

Title: Show all the circuit and prototype to advisor.


Objective:
To verify my project to advisor.


Result and Analysis:
My advisor verify and said well done.

Friday, 30 March 2012

WEEK 11


Title:
Final Year Project briefing. 



Objective:
To gain knowledge from the briefing.



Contents / Procedures: 
For this week, there is Final Year Project briefing at TTL 1. The committee is Dr  Mohd Khairil bin Rahmat and Mr Shamsul Zahari bin Shahidin. Some point of the briefing is on the T-Shirt, claiming budget and submission of the report for FYP Sem 2 and Diploma students. Plus, to reminds the students on the presentation day for Degree Sem 1 and Engineers Day for Degree Sem 2 and Diploma students.


Friday, 23 March 2012

Friday, 16 March 2012

WEEK 9

Title: Troubleshooting all circuit


Objectives:
To analyse the circuit performance.


Content / Procedure:
All circuit have been  brazing.
Do a component test. Collect an old component that have been used in order to reduce a cost.
Try to do some test towards circuit to analyse the performance.


Result and Analysis:
Have some circuit have problem because of some component burn or damage.

Wednesday, 7 March 2012

WEEK 8

Title: Construct the circuit.


Objectives: 
> To make a circuit PCB etching and drilling.
> To Test a PCB Inverter circuit.
> To analyse the circuit performance.


Content / Procedure: 
> Prepare a material to do circuit etching.
> Do a component test. Collect an old component that have been used in order to reduce a cost.
> Try to do some test towards etching circuit to analyse the performance.


Result and Analysis:
I'm done a construction for  High Current Inverter Circuit. The circuit is fly-back converter and using 555 timers as an controller.
This testing part was done by using my old equipments that have been used during my studies.
The circuit PCB design and the pictures during etching the inverter circuit.